Business Aviation Essentials

Directory
AC-U-KWIK Premium
Annual subscription provides online access to information for airports, FBOs, and aviation support services around the world, PLUS direct email, phone...
AWIN Intelligence Bundles
AWIN - Business Aviation
Integrating unsurpassed content, trustworthy data, exclusive analytics and meaningful insight, AWIN Business Aviation is the faster, easier way to mon...

Premium News & Analysis

Jun 01, 2015
​The first production-conforming aircraft, dubbed P1, is coming together at Cirrus’ facilities in Duluth, Minnesota, where the pressure vessel built at the company’s Grand Forks, North Dakota, facility and shipped to Duluth is being bonded to the tail and other components. Meanwhile, three conforming prototypes — C0, C1 and C2 — are taking part in the FAA certification program and have accumulated more than 400 hr. flight time. A fourth aircraft, a proof-of-concept model called V1, is also flyable.
Jun 01, 2015
​The first production-conforming aircraft, dubbed P1, is coming together at Cirrus’ facilities in Duluth, Minnesota, where the pressure vessel built at the company’s Grand Forks, North Dakota, facility and shipped to Duluth is being bonded to the tail and other components. Meanwhile, three conforming prototypes — C0, C1 and C2 — are taking part in the FAA certification program and have accumulated more than 400 hr. flight time. A fourth aircraft, a proof-of-concept model called V1, is also flyable.
Jun 01, 2015
Cirrus Aircraft is expanding its “Vision Center” in Knoxville, Tennessee, after a site search that included 15 states and 30 airport locations, the company said.
Jun 01, 2015
The FAA has proposed a $150,000 civil penalty against Ameriflight, based in Burbank, California, for allegedly operating a Beech BE-99 when it was not in compliance with FAA regulations. The FAA alleges that the pilot noted in the aircraft’s maintenance log on Jan. 8, 2010, that water was leaking through a gap in the windshield above the copilot’s visor. The same day, a mechanic “patch sealed” the windshield by applying sealant over the gap, and the company returned the aircraft to service.
Jun 01, 2015
Companies involved in newsgathering, agriculture and rail transport have partnered with the FAA in the hope of extending operations of small unmanned aircraft beyond the limits outlined in proposed rules unveiled in January. CNN, PrecisionHawk and BNSF Railway have committed significant resources to the FAA’s Pathfinder program, Administrator Michael Huerta announced in Atlanta on May 6 at the Association of Unmanned Vehicle Systems International’s Unmanned Systems 2015 convention.
Jun 01, 2015
Gulfstream Aerospace Corp. has selected GKN Aerospace to produce the wing skins for its G500 and G600 ultra-long-range business jets. In a long-term contract, GKN Aerospace will produce the upper and lower wing skins for development and production aircraft at its Wellington, Kansas, advanced machines structures facility. The skins will be constructed in a single piece, which eliminates the fasteners and joints, and lowers weight and required maintenance, GKN said.
Jun 01, 2015
​The FAA has proposed a $1.54 million civil penalty against Air Methods Corp., an emergency medical transport company, for allegedly operating Eurocopter EC-130 helicopters that were not in compliance with FAA regulations. The FAA alleges that Air Methods operated two helicopters on 70 flights carrying passengers for compensation or hire. The flights were over water and beyond power-off gliding distance from the shore and lacked the required flotation devices and flotation gear for each passenger.
Jun 01, 2015
VistaJet, based in London, added 10 new aircraft to its fleet during the first three months of 2015 to keep up with strong global demand, the company said. It also plans to add up to 10 new Bombardier Challenger 350 business jets for use in the U.S. over the next two years, the company said.