FAA Orders Replacement Of Backup Generators On Boeing 777s
FAA, citing reports of two in-flight engine shutdowns, yesterday ordered Boeing 777 operators to inspect backup generators and replace any with sheared shafts within 14 days. If both left and right backup generators are replaced at the same time, operators must perform a non-ETOPS flight before...
Subscription Required
This content requires a subscription to one of the Aviation Week Intelligence Network (AWIN) bundles.
Schedule a demo today to find out how you can access this content and similar content related to your area of the global aviation industry.
Already an AWIN subscriber? Login
Did you know? Aviation Week has won top honors multiple times in the Jesse H. Neal National Business Journalism Awards, the business-to-business media equivalent of the Pulitzer Prizes.




