Flawed KC-46 Boom Design Slipped Through Acquisition System: IG

Credit: USAF
Boeing changed the off-the-shelf design of the original refueling boom a year after the KC-46 contract award, but the U.S. Air Force’s acquisition office never updated system’s assessed technology risk level, the Defense Department’s Inspector General (IG) said May 27 in a critical new report. The...
Steve Trimble

Steve covers military aviation, missiles and space for the Aviation Week Network, based in Washington DC.

Subscription Required

 

Flawed KC-46 Boom Design Slipped Through Acquisition System: IG is published in Aerospace Daily & Defense Report, an Aviation Week Intelligence Network (AWIN) Market Briefing and is included with your AWIN membership.

Already a member of AWIN or subscribe to Aerospace Daily & Defense Report through your company? Login with your existing email and password.

Not a member?  Learn how you can access the market intelligence and data you need to stay abreast of what's happening in the aerospace and defense community.