Air Transport Safety, Ops & Regulation
Jul 03, 2013
Libyan Airlines has selected a comprehensive package of its aeronautical solutions from Germany's Lufthansa Systems. The two companies signed a five-year contract for the Lido/Flight flight planning solution as well as the Lido/RouteManual and Lido/eRouteManual navigation charts.
Jul 03, 2013
Sheikh Zayed Air Navigation Centre of UAE General Civil Aviation Authority (GCAA) has successfully implemented Arrival Manager System (AMAN) -the first to go operational in the Middle East .
Jul 02, 2013
FAA is investigating an incident in which a Spirit Airlines Airbus A319 apparently came within 1.6 miles horizontally and 400 feet vertically of a skydiving aircraft.
Jun 27, 2013
FAA has granted Boeing approval to fly Required Navigation Performance-Authorization Required (RNP-AR) procedures on 787s.
Jun 27, 2013
WheelTug has completed a Slot Purchase Agreement with airBerlin, bringing the order book for its electric drive system to 549 delivery slots reserved by 10 airlinesin Europe, the US, the Middle East and Asia-Pacific.
Jun 27, 2013
Boeing has made significant improvements in its environmental performance, even as total aircraft deliveries increased 50% from 2007 to 2012, the company announced in its annual Environment Report. Boeing's manufacturing and office employees consumed less energy and water, reduced carbon dioxide emissions, generated less hazardous waste and sent less solid waste to landfills. Highlights of the 2013 report include:
Jun 27, 2013
ATW editorswill select the winners of its 2nd annual Eco-Aviation Awards in July in the lead up to its 6th annual Eco-Aviation Conference in Washington, DC. This year’s conferencewill focus on overall sustainability, affordability and overcoming political hurdles within the air transport industry, particularly those social, economic and environmental developments that will improve and have a lasting effect on the industry’s future environmental performance. Panel topics include:
Jun 27, 2013
Rolls-Royce has admitted it “clearly fell short” after the Australian Transport Safety Bureau (ATSB) concluded that a fatigue crack in an incorrectly manufactured oil feed pipe caused a Qantas Airbus A380 engine failure.