FAA Wants To Mandate Modification Of GE-Powered Boeing 767s
FAA proposed a rule to require operators of GE-powered Boeing 767s to modify the nacelle strut and wing structure to prevent fatigue cracking. The proposal was prompted by reports that actual operational loads on the nacelle are "higher than the analytical loads that were used during initial design...
Subscription Required
This content requires a subscription to one of the Aviation Week Intelligence Network (AWIN) bundles.
Schedule a demo today to find out how you can access this content and similar content related to your area of the global aviation industry.
Already an AWIN subscriber? Login
Did you know? Aviation Week has won top honors multiple times in the Jesse H. Neal National Business Journalism Awards, the business-to-business media equivalent of the Pulitzer Prizes.




