Lockheed NGI Passes Subsystems PDR, On Track For 2027 Fielding

Lockheed Martin’s Next Generation Interceptor concept.

Credit: Lockheed Martin
HUNTSVILLE, Alabama—Lockheed Martin says its proposal for the Missile Defense Agency’s (MDA) Next Generation Interceptor (NGI) is on schedule for an early fielding as it recently passed a preliminary design review (PDR) of all of its subsystems. The company announced Aug. 7 that all elements of its...
Brian Everstine

Brian Everstine is the Pentagon Editor for Aviation Week, based in Washington, D.C. Before joining Aviation Week in August 2021, he covered the Pentagon for Air Force Magazine. Brian began covering defense aviation in 2011 as a reporter for Military Times.

Subscription Required

 

Lockheed NGI Passes Subsystems PDR, On Track For 2027 Fielding is published in Aerospace Daily & Defense Report, an Aviation Week Intelligence Network (AWIN) Market Briefing and is included with your AWIN membership.

Already a member of AWIN or subscribe to Aerospace Daily & Defense Report through your company? Login with your existing email and password.

Not a member?  Learn how you can access the market intelligence and data you need to stay abreast of what's happening in the aerospace and defense community.