Guy is a Senior Editor for Aviation Week, based in Colorado Springs. Before joining Aviation Week in 2007, Guy was with Flight International, first as technical editor based in the U.K. and most recently as U.S. West Coast editor. Before joining Flight, he was London correspondent for Interavia, part of Jane's Information Group.
In 2013 the Jesse H. Neal award for Best Technical Content was awarded to Guy Norris and Graham Warwick for their Advanced Propulsion feature. He received the 2015 Lauren D. Lyman Award for outstanding achievement in aerospace communications. And in 2018 he was awarded Technology Writer of the Year by the judges of the Aerospace Media Awards.
Guy is also a multiple winner of the Royal Aeronautical Society Aerospace Journalist of the Year Award in the Air Transport, Propulsion and Systems/Technology categories, and in 2006 he received the Royal Aeronautical Society Decade of Excellence Award for sustained achievement in aerospace journalism.
Amongst other works Guy has authored the aerospace section of a science encyclopedia and co-authored, and produced an educational aviation CD-ROM. Guy has also authored more than a dozen books on the histories of Airbus, Boeing and other airframe manufacturers.
KENNEDY SPACE CENTER, Fla. — Final elements of the International Space Station (ISS) are moving toward completion in NASA’s Space Station Processing Facility (SSPF) here, where near-term work is focused on completing the payload for STS-127, scheduled for a June 13 launch.
US Airways will complete flight trials of the Lumexis Fiber-To-The-Screen (FTTS) inflight entertainment system around May 26 but, despite a trouble-free experience and positive passenger feedback, is not currently planning to acquire the system owing to ongoing economic pressures.
Boeing remains on track for the final body join of the first stretched 747 next month by completing assembly of the forward fuselage of the initial 747-8 Freighter, RC501. The 89 ft., 2 in., fuselage section, incorporating the original model upper deck profile, was moved on May 17 from the final assembly installation tool for sealing and testing before beginning systems installation.