Guy is a Senior Editor for Aviation Week, based in Colorado Springs. Before joining Aviation Week in 2007, Guy was with Flight International, first as technical editor based in the U.K. and most recently as U.S. West Coast editor. Before joining Flight, he was London correspondent for Interavia, part of Jane's Information Group.
In 2013 the Jesse H. Neal award for Best Technical Content was awarded to Guy Norris and Graham Warwick for their Advanced Propulsion feature. He received the 2015 Lauren D. Lyman Award for outstanding achievement in aerospace communications. And in 2018 he was awarded Technology Writer of the Year by the judges of the Aerospace Media Awards.
Guy is also a multiple winner of the Royal Aeronautical Society Aerospace Journalist of the Year Award in the Air Transport, Propulsion and Systems/Technology categories, and in 2006 he received the Royal Aeronautical Society Decade of Excellence Award for sustained achievement in aerospace journalism.
Amongst other works Guy has authored the aerospace section of a science encyclopedia and co-authored, and produced an educational aviation CD-ROM. Guy has also authored more than a dozen books on the histories of Airbus, Boeing and other airframe manufacturers.
NASA has selected a Williams International high-speed turbojet as the turbine element of its Turbine Based Combined Cycle (TBCC) engine test rig, which will be used to evaluate technologies for potential future two-stage to orbit launcher concepts.
BREMEN, Germany Test officials preparing for first flight of the X-51 scramjet demonstrator say issues with the U.S. Air Force B-52 mothership may delay the first hypersonic flight attempt to early 2010.
Boeing says first flight of the 787 remains on track for sometime before yearend, despite reports circulating last week that this could be pushed into 2010 following recent issues with the side-of-body modification. In a statement, Boeing 787 Vice President and General Manager Scott Fancher said, “The design of the side-of-body solution is on track. Installations of the fittings are proceeding well and we are pleased with the progress we are making on this important effort. We continue to be on track to fly the 787 by the end of the year.”